Standard
Rubber Gloves
Class 00,0,1,2,3
TESTING PROCESS
At a minimum, ASTM standards require that the inspection and testing process include the following steps:.
- Check-in
- Removing previous testing marking
- Washing using cleaning agents that will not degrade the insulating properties
- Visual inspection of all surfaces (inside and out)
- Electrical testing
- Final inspection
- Recordkeeping
- Marking
- Packing in appropriate containers for storage or shipment
TESTING INTERVALS
The interval between the date of issue and electrical testing should be based on work practices and test experience. For gloves, the interval shall not exceed 6 months except for industries such as telecommunications that utilize insulating gloves as precautionary protection, in which case the maximum interval may be increased to 9 months. For sleeves and blankets, the interval shall not exceed 12 months. For line hose and covers, no minimal maximum interval is specified; Electrical testing shall be performed if the periodic cleaning and visual inspection identifies conditions that might adversely affect performance and safety.
RESIDENTIAL
Iconic architecture expertly developed
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Aliquam fringilla est sapien, nec semper neque auctor nec. Duis vehicula quis mi at vehicula. Vivamus at.
30+
Years of experience
10x
Builder of the year